Thursday, 28 April 2016

NERANG QLD 4211
30 KW SYSTEM FOR A SOLAR COMPANY - ALPHA ECO SOLAR 10 KW AS A TEST
PANELS ARE ON A 2 DEG PITCH, I HAVE FOUND THIS NOT TO BE A GOOD THING!!!!


Alpha Eco Solar for 10Kw System on Roof of warehouse - 40 Panels
Coated Array - A - Looking for increase to 4.1493924kw/hr on inverter A
30/09/15 - 07:46am
Inverter A - 43066.9Kwh - 12456Hrs - (7.8Kwh - 2Hrs 55min) - 3.4575224kw/hr
Inverter B - 56389.3Kwh - 16904Hrs - (7.8Kwh - 2Hrs 51min) - 3.3358554kw/hr
Inverter C - 47703.8Kwh - 14160Hrs - (7.9Kwh - 2Hrs 50min) - 3.3689124kw/hr

30/09/15 - 10.56am
Inverter A - 43088.6Kwh - 12459Hrs - (29.5Kwh - 6Hrs 5min) - 3.4581316kw/hr
Inverter B - 56410.8Kwh - 16907Hrs - (29.3Kwh - 6Hrs 1min) - 3.3365351kw/hr
Inverter C - 47725.5Kwh - 14163Hrs - (29.6Kwh - 5Hrs 59min)-3.3697309kw/hr

28/10/15 - Check Up
Inverter A  44588.5Kwh - 43066.9Kwh / 28 Days = 54.342857Kwh/Day
Inverter B  57831.5Kwh - 56389.3Kwh / 28 Days = 51.507142Kwh/Day
Inverter C  49160.7Kwh - 47703.8Kwh / 28 Days = 52.032142Kwh/Day

05/02/16 - Check Up
Inverter A   49791.8Kwh - 43066.9Kwh /128 Days = 52.538281Kwh/Day
Inverter B   62694.0Kwh - 56389.3Kwh / 128 Days = 49.255468Kwh/Day
Inverter C   54064.1Kwh - 47703.8Kwh / 128 Days = 49.689843Kwh/Day

29/04/16 - Check up and Clean - Alpha coated 10Kw again - 2 Deg Pitch - Not Good!
Inverter A  53532 Kwh - 43088.6 Kwh / 180 Days = 58.02 Kwh/Day - $29.00/Day
Inverter B  66257 Kwh - 56410.8 Kwh / 180 Days = 54.70 Kwh/Day - $27.35/Day
Inverter C  57631 Kwh - 47725.5 Kwh / 180 Days = 55.03 Kwh/Day - $27.52/Day

Coated Section "A" Has Made an Extra $270 in the six months it has been Treated For!

After 6 Months my Aim was to Achieve at least 4.2Kw/Kw/Day - This is the CEC Average!

29/04/16 - Cleaned all Panels!
Inverter A - Producing 5.802Kwh/Kw/Day - 5.43339% Better than Inverter C (Reason is Pitch of Panels)
Inverter B - Producing 5.470Kwh/Kw/Day
Inverter C - Producing 5.503Kwh/Kw/Day